Subsea Connector Removal Shelf subsea provided tooling and divers to replace a damaged subsea connector at 85m water
Greater Western Flank Phase 1 Shelf Subsea installed the Greater Western Flank phase 1 (GWF-1) subsea tie-back system to the
Gorgon Post Development Surveys Diving support for environmental surveys for the Gorgon development, inspection, repair and maintenance of mooring
Van Gogh Deepwater Turret Mooring Repair Project Shelf Subsea provided personnel, tooling and equipment to replace the Ningaloo Vision DTM buoy fender
Gorgon LNG Jetty & Marine Structures Provided Saipem Leightons Consortium (SLC) with a full range of diving services for the construction
NCC Buoy Removal Shelf Subsea removed the 350Te NCC buoy using both air and saturation divers on board
John Brooks Pipe Replacement Shelf Subsea replaced 500m of the John Brookes pipeline in 65m of seawater using saturation
LNG Loading Arms Project Management, Engineering, Marine and Construction Services for the installation of the 10 Gorgon LNG
Telstra Fibre Project Management, Engineering, Marine and Construction Services for shallow water lay, beach pull and diving
Prelude Air Dive System Shelf subsea designed, built and commissioned a Lloyds classed, Zone II dive system onboard Shell’s
ENAP Sipetrol PIAM Project Shelf subsea installed all subsea tie-ins for the PAIM project in the Magallanes Field, Argentina.