Project Scope of Work
As part Asset Integrity Management system Santos perform Inspection, Repair and Maintenance works to ensure the integrity for design life to 2043 of the all facilities in the Kumul Marine Terminal complex including the Kumul export pipeline system, Pipeline end manifold, Catenary Anchor Leg Mooring buoy, platform structures, flexible flow lines and Well Pad facilities. In particular the CALM shall comply with ABS special inspection requirements.
The following activities were included in the Scope of work:
Project Summary
Santos PNG program was another successful project executed in challenging environmental conditions. The project team performed excellently in preparing the vessel, equipment and people for this job which is in a very remote area with extremely limited access to supply lines. There was no room for error, and none was made.
Also notable for the project was the careful timing and planning of dive task plans – as the area is subject very strong tidal flows, so work plans had to be executed with minute accuracy to take advantage of the neap tide window.