Case Study

Salman Project – New field construction

Project Scope of Work

As part of BSP’s hydrocarbon production growth strategy, the Salman Waterflood Development was

commenced as a new greenfield development opportunity. Partially executed in

 

2022. Shelf Subsea was invited to complete the remaining scope.

The extensive program included the following activities:

Transportation and Installation of:

  • Installation of Rigid Risers & Clamps
  • Legacy Riser removal
  • Installation & Fabrication of Spools
  • Umbilical Lay and Installation
  • Flexible lay and installation
  • Tie Ins
  • Pipeline replacement
  • Pipeline crossings
  • Pipeline stabilization / mattressing / Bags
  • Leak testing and Precommissioning assistance
  • Cathodic Protection
  • J Tube installation
  • As found and As Built Survey

Project Summary

The Salman project marks the largest Transport and Installation work performed by Shelf Subsea to date, requiring extensive project management and engineering. A total five vessels were required for the project posing a large logistical challenge for permitting and chartering which was well management by the team. Also notable highlights was the outstanding performance of the Southern Star with no recordable down time and the HSE performance.

The Salman project is a milestone demonstrating Shelf Subseas capacity to successfully manage large T&I / turnkey installation projects.