Projects

Subsea Connector Removal

Shelf subsea provided tooling and divers to replace a damaged subsea connector at 85m water

Greater Western Flank Phase 1

Shelf Subsea installed the Greater Western Flank phase 1 (GWF-1) subsea tie-back system to the

Gorgon Post Development Surveys

Diving support for environmental surveys for the Gorgon development, inspection, repair and maintenance of mooring

Van Gogh Deepwater Turret Mooring Repair Project

Shelf Subsea provided personnel, tooling and equipment to replace the Ningaloo Vision DTM buoy fender

Landing craft

Gorgon LNG Jetty & Marine Structures

Provided Saipem Leightons Consortium (SLC) with a full range of diving services for the construction

NCC Buoy Removal

Shelf Subsea removed the 350Te NCC buoy using both air and saturation divers on board

John Brooks Pipe Replacement

Shelf Subsea replaced 500m of the John Brookes pipeline in 65m of seawater using saturation

LNG Loading Arm

LNG Loading Arms

Project Management, Engineering, Marine and Construction Services for the installation of the 10 Gorgon LNG

Telstra Fibre Job

Telstra Fibre

Project Management, Engineering, Marine and Construction Services for shallow water lay, beach pull and diving

Prelude Air Dive System

Shelf subsea designed, built and commissioned a Lloyds classed, Zone II dive system onboard Shell’s

ENAP Sipetrol PIAM Project

Shelf subsea installed all subsea tie-ins for the PAIM project in the Magallanes Field, Argentina.