Project Scope of Work
Eni has started gas production from the Merakes Project in 2021 , located in the East Sepinggan block East
Technip FMC as the installers of the original SPS have requirement to ensure ongoing operability including satellite subsea production systems, engaged Shelf Subsea over a number of seasons to perform their IRM operations.
This particular scope included:

Project Outcome

A technically complex project to replace a flying lead through ROV intervention at nearly 1500m water depth, and perform further fault finding, general rectification, relocation, and stabilization of the flying lead. Shelfs engineering team ensure the work was completed smoothly and without issues.
With operating water depths at 1489 meters there were great challenges on the ROV systems which performed well and completed the work without incident.